UPTOWN STATION GARAGE - Normal, IL

Walls or ceilings bowed more than 1/4 inch within any 32 inch horizontal or vertical measurement is a deficiency. Responsibility. We will repair the bowed area ...



Télécharger

Inspection Report - R. Heyl and Associates, LLC
Control Joint Sealant Replacement: Remove the existing cove joint sealant within the parking garage and install new flexible joint sealant according to the 
Chapter Six Appendix - New Castle County
1. Photo 1-2: Rear foundation wall has bowed inward and stabilization repairs are required. Contact reputable foundation repair contractors for suggestions and 
HOW TO INSPECT THE EXTERIOR - InterNACHI
Where the structural integrity of the wall is affected, suitable repair or replacement shall be done to eliminate the condition. Repairs to 
care and repair of the house - NIST Technical Series Publications
A bowing wall may indicate a problem with the attachment to the structure. The ties may have pulled out of the structural frame of the building. They may 
TM 5-620 Facilities Engineering Maintenance and Repair of ...
If the grates are warped or broken or if the walls of the fire box are cracked, new parts should be ordered and repairs made promptly. Boilers should be 
Untitled - Sherlock Home Inspection
manual provides technical guidance for the maintenance and repair of buildings and structures at military installations. These standards should.
New Little League Concessions Stand - Aransas Pass, TX
OWNER's Project Number: 40087. D. Project Location: 200 E. Johnson Ave.. Aransas Pass, Texas78336. E. The Owner, 
FDL MNAW EXTERIOR IMPROVEMENTS 024071.00
DSGW. All rights reserved. The architectural works depicted herein are the sole property of DSGW and may not be constructed or.
Contract Review Sheet - Marion County
2. Representatives. Unless otherwise specified in the Contract Documents, the OWNER designates Tamra Goettsch as its. Authorized Representative 
TABLE OF CONTENTS - Missouri Department of Transportation
Notify architect/owner of any test failures. Submit weekly pipe test log listing service; section tested, initial and final pressure, time and temperature 
SECTION 013100 PROJECT MANAGEMENT AND COORDINATION
After Owner occupancy of premises, coordinate access to site by various trades for correction of defective work and work not in accordance with 
SECTION 00 0101 PROJECT TITLE PAGE PROJECT MANUAL ...
After Owner occupancy of premises, coordinate access to site for correction accordance with data supplied by the Owner and/or the various utility companies.